PROJECT : Construction, installation and fit out of a brand new café for Pret at Gatwick Airport Airside 3A
TIMESCALE : 5 WEEKS
330c5d_622d39b0a548415e8bbc791252b5bbdf~mv2
Construction

Installation of new drylined walls and all wall finishes; tiled, wooden panels and painted. Installation of new vinyl flooring and altro flooring. New signage and branding installed.

330c5d_c22b8b992ecd4aeb99d7c5f4f33d095b~mv2
Catering Install

Brand new servery counter area installed including a reconfiguration of the existing kitchen area and installation of new catering equipment.

330c5d_d1f028d9f6e443d8b085ef141c1b9420~mv2
Electrical & Plumbing
  • Installation of new electrical system, lighting and all outlets. Installation and modifications to fire alarm system.
  • Installation of new plumbing system