
PROJECT : Full installation and fit out of a brand new bar for Glenmorangie.
TIMESCALE : 10 WEEKS

Construction
- Installed stud walls to create defined spaces within the shop
- Installed bespoke furniture including display units, counters and shelves
- Built a suspended ceiling with built-in lighting fixtures
- Fitted a comprehensive range of flooring options including Altro safety flooring and various tiling.
- Painted and decorated, ensuring a seamless finish.

Plumbing
- Planned and installed a new plumbing system, including supply lines, drainage, and waste pipes, to meet the shop’s requirements.
- Installed plumbing fixtures such as sinks, faucets, and toilets, ensuring proper connections and functionality

Electrical
- Installed a wide range of electrical components, including outlets, switches, lighting fixtures, and power panels.
- Installed all wiring for integrated TV screens