Skip to content
Glenmorangie-Master-Logo-orange-scaled-e1659673429679
PROJECT : Full installation and fit out of a brand new bar for Glenmorangie.
TIMESCALE : 10 WEEKS
330c5d_caf1825f95464712b6e159220006b972~mv2
Construction
  • Installed stud walls to create defined spaces within the shop
  • Installed bespoke furniture including display units, counters and shelves
  • Built a suspended ceiling with built-in lighting fixtures
  • Fitted a comprehensive range of flooring options including Altro safety flooring and various tiling.
  • Painted and decorated, ensuring a seamless finish.
330c5d_95d9b429f8924333957a755be202a723~mv2
Plumbing
  • Planned and installed a new plumbing system, including supply lines, drainage, and waste pipes, to meet the shop’s requirements.
  • Installed plumbing fixtures such as sinks, faucets, and toilets, ensuring proper connections and functionality
330c5d_95d9b429f8924333957a755be202a723~mv2
Electrical
  • Installed a wide range of electrical components, including outlets, switches, lighting fixtures, and power panels.
  • Installed all wiring for integrated TV screens