PROJECT : Construction, installation and fit out of a brand new café for Pret Gatwick Airport Airside 3B
TIMESCALE : 5 WEEKS

Construction
- Installation of new drylined walls and all wall finishes
- Tiled, wooden panels and painted.
- Installation of new vinyl flooring and altro flooring.
- Installation of new MF ceiling and bulkhead
- installed bespoke bult curved wall and cappings.
- New signage and bespoke furniture installed.

Catering Install
Brand new servery counter area installed including a reconfiguration of the existing kitchen area and installation of new catering equipment.

Electrical, Refrigeration & Plumbing
- Installation of new electrical system, lighting and all outlets. Installation and modifications to fire alarm system.
- Installation of new plumbing system
- Installation of new HVAC system including langars and other refrigeration units