Skip to content
Pret-logo
PROJECT : Construction, installation and fit out of a brand new café for Pret Gatwick Airport Airside 3B
TIMESCALE : 5 WEEKS
330c5d_882e825301a34c6990b01b1dd82dd45a~mv2
Construction
  • Installation of new drylined walls and all wall finishes
  • Tiled, wooden panels and painted.
  • Installation of new vinyl flooring and altro flooring.
  • Installation of new MF ceiling and bulkhead
  • installed bespoke bult curved wall and cappings.
  • New signage and bespoke furniture installed.
330c5d_79522f06f734476fb4fd71313e03c17d~mv2
Catering Install

Brand new servery counter area installed including a reconfiguration of the existing kitchen area and installation of new catering equipment.

330c5d_5058e0d55ea34d95bad55ea14ba504cd~mv2
Electrical, Refrigeration & Plumbing
  • Installation of new electrical system, lighting and all outlets. Installation and modifications to fire alarm system.
  • Installation of new plumbing system
  • Installation of new HVAC system including langars and other refrigeration units