PROJECT : Full shop fit out including mechanical, electrical and building works to build a shop from shell and core.
TIMESCALE : 12 WEEKS
YSL before
Initial Stage

Complete building works from the shell of the existing and core of the existing space.

​Work Done:

 

  • Clearing and preparation of the construction site.
  • Removal of any previous installations or debris.
  • Initial leveling and cleaning of the floor.
330c5d_3eb0f7abdf0446f5bed5c342fb1c8357~mv2
Intermediate Stage

Work Done:

 

  • ​Installation of structural elements and wall panels.
  • Beginning of the electrical wiring and installation of lighting fixtures.
  • Partial installation of flooring.
  • Deployment of construction equipment and materials for ongoing work.
330c5d_23dec408223b4453a6fb005602ee0287~mv2
Electrical and Utility Installations
  • Installation of electrical wiring and conduits.
  • Mounting of electrical panels and utility boxes.
  • Further progress on wall preparation and finishing touches.
330c5d_d5c24501b01340d7a32093e88ba945ba~mv2
Completion

Complete turn-key product:

 

  • Painting and decorating
  • Fitted out bespoke furniture
  • Light fittings and outlets
  • Flooring and walls complete